Equipment

The required heavy equipment for the proper handling of incoming waste is described. This section of the SOP provides the minimum number of units required along with performance requirements for each type of unit. Currently, the site's primary equipment includes 3 dozers, 3 compactors and 2 scrapers (see photos below). Numerous other secondary units are utilized for on-site road maintenance, dust control and operational support.

« Back to Site Operating Plan